Durack was awarded the contract to repair various flood damaged roads throughout the Logan Shire.
The works included supply and installation of new re-sheet gravel to damaged roads and crossings, drainage repairs, heavy and medium formation grading and traffic control.
A logistically challenging project with tight corners and load limited bridges - Durack applied knowledge from numerous flood damage projects to deliver ontime and under budget.