Project Description:
Demolition and removal of two existing timber bridges and construction large cell concrete box culverts in their place
Scope:
Demolition of existing infrastructure, dewatering and works in waterways, excavation, concrete works, installation of 3000x1500 RCBCs, backfill, pavement construction, rock protection and landscaping
Challenges:
Groundwater inundation into the work area requiring ongoing dewatering